Transportation & Installation Guidelines for DPP260Ki Blister Machine

Overhead Crane Operations: The machine has a net weight of approximately 1,800 kg. To ensure an adequate safety margin, the lifting equipment must possess a certified Safe Working Load (SWL) exceeding 3,000 kg. Ensure that each individual lifting hook or attachment point is rated to safely support a minimum of 2,500 kg, keeping the lifting cables strictly vertical.
Forklift Operations: Considering the 1,800 kg net weight, the forklift must have a certified load capacity exceeding 2,500 kg. Operators must critically evaluate the machine’s specific center of gravity prior to lifting to maintain absolute stability. Once elevated, transport the equipment directly to the designated installation site using secure fixing methods.

Loading & Unloading Operations
✔️ Correct Handling Method


Correct lifting method for DPP260Ki

❌ Incorrect & Dangerous Method


Incorrect lifting method for DPP260Ki

Vibration Isolation & Siting: Position the machine horizontally within the designated area. While permanent foundation anchoring is not required, 12 mm thick industrial-grade anti-vibration rubber mats must be placed beneath each load-bearing foot to prevent floor damage and inhibit unintended lateral displacement.
Leveling & Stability: Once sited, properly engage and adjust all eight leveling feet (foot screws) located beneath the machine chassis. Conduct a final inspection to verify that all eight mounts are firmly seated and the chassis is structurally rigid.
De-greasing & Sanitization: Prior to commissioning, thoroughly clean the entire machine to completely remove all protective anti-corrosion oils applied to the external surfaces during shipping.