JORNEN Machinery has successfully concluded the installation, commissioning, and Site Acceptance Testing (SAT) of an Alu-Alu DPP260K2 Blister Packaging Machine at a pharmaceutical manufacturing facility in Australia.
The deployment was overseen by JORNEN service engineer Sun Changhu. The commissioning protocol encompassed complete mechanical calibration, safety systems verification, and comprehensive operator training. The on-site instruction ensured the client’s technical personnel could execute independent operation and routine fault handling in strict accordance with established safety procedures.
In the official post-commissioning sign-off, the client validated the machine’s operational readiness and the efficacy of the training program. Additionally, the client provided valuable field engineering feedback, noting that automated parameter setting for individual stations would further optimize format changeovers. This critical field data continuously drives JORNEN’s R&D, directly validating the necessity of the automated servo-driven indexing systems now featured in our advanced “Ki” series architecture.
Official SAT and Operator Training Sign-Off Report