Project Inquiry: RFP for High-Speed Versatile Cartoning Machine (Serbia)

Project Overview: A diversified manufacturing company based in Belgrade, Serbia (Slobodna Zona), specializing in dietary supplements, medical devices, and upcoming pharmaceutical products, has issued a formal Request for Proposal (RFP). The client requires a highly versatile, GMP-compliant Cartoning Machine to automate their secondary packaging processes across multiple product lines.

1. Production Capacity & Hybrid Feeding System
The equipment must operate at a high-speed capacity of 200 cartons per minute and feature a hybrid feeding architecture to accommodate diverse product formats:

  • Automated In-Line Feeding: Direct procedural integration with an existing Blister Machine to package 1, 2, or 3 blister cards per carton.
  • Manual Bucket Loading: Provisions for operators to manually load secondary formats into the bucket conveyor, including glass syrup bottles (125ml, 250ml), PE/PET spray containers (20ml, 30ml, 100ml), and powder sachets (1g to 20g).
  • Blister Carton Dimensions: Precisely configured for 116x75x17 mm (1 card), 118x82x22 mm (2 cards), and 130x80x30 mm (3 cards).

2. Automation, Coding & Quality Inspection
To ensure zero-defect packaging, the cartoner must be equipped with comprehensive sensor arrays and coding modules:

  • Integrated Accessories: An automatic Patient Information Leaflet (PIL) folding machine and a 3-row minimum inkjet printing system.
  • Verification Systems: Automated sensors for product placement, PIL insertion verification, blister count accuracy, and print quality inspection.
  • Barcode & Safety: EAN code verification on both cartons and instructions, alongside electro-mechanical safety interlocks to automatically halt the machine upon detecting operational irregularities.

3. GMP Validation & Service Level Agreement (SLA)
The procurement strictly mandates European conformity (CE marks) and full pharmaceutical validation:

  • Qualification Protocols: Execution of IQ, OQ, and PQ during the on-site commissioning and handover phase.
  • Documentation: Comprehensive bilingual manuals (English and Serbian), material certificates, and preventive maintenance programs provided prior to qualification.
  • Warranty & Support: A robust 2-year warranty covering on-site repairs for manufacturing defects, operator training, and a defined SLA for post-warranty spare parts and maintenance reaction times.